Microsoft solutions Guide

    Industry data model Microsoft

    Common Data Model for Nonprofits: connect the data and plan stewardship

    What the nonprofit foundation models, how it differs from a finished app, and what Microsoft’s February 2027 support transition means for your organization.

    Online24x7 EditorialReviewed November 23, 2026DataversePower Apps

    Documented lifecycle: Retirement announced. Microsoft plans to transfer CDM for Nonprofits stewardship to threshold and ends engineering support for the Microsoft-managed version February 1, 2027. Existing solutions are not automatically deleted.

    This label reflects the cited product documentation; it does not establish whether this product or feature is installed, licensed or enabled in your tenant.

    Editorial review date: November 23, 2026. Microsoft may update availability and product details; confirm the linked sources before making a production decision.

    A nonprofit wants fundraising, awards and programme impact to refer to the same constituents and outcomes. A shared model can reduce incompatible definitions, but it does not automatically merge records or replace each department’s application.

    Who it is for

    Nonprofit data owners, fundraising and programme teams, and partners designing cross-department information models.

    Where it fits

    A nonprofit wants fundraising, awards and programme impact to refer to the same constituents and outcomes. A shared model can reduce incompatible definitions, but it does not automatically merge records or replace each department’s application.

    What is included

    Microsoft describes more than 90 entity definitions and relationships covering constituents, fundraising, awards, programme delivery and impact tracking. Examples include donor commitments, designations, transactions, awards, disbursements, results, indicators and benefit recipients. It is a core solution layer independent of Dynamics 365, not a ready-made fundraising user interface.

    Prerequisites to check

    Agree common definitions and identifiers before introducing a foundation schema. Evaluate Power Platform, Dataverse, integration and reporting licences for the actual implementation; open-source schema access does not make platform usage free. Inventory all downstream solutions that depend on the existing Microsoft-managed version.

    Setup and adoption

    Follow the published transition guidance rather than assuming the tenant package will receive future updates. Map extensions, managed solution dependencies and connected systems. Work with the proposed community steward or a qualified provider to choose a tested migration path and name an owner for maintenance and compatibility.

    Start with a shared definition, not a bulk import

    Ask fundraising and programme delivery to describe a single constituent and the roles that person or organization can have. Decide when a recipient, donor and implementing partner should share an identity and when privacy requires separation. Then map one award, its disbursements and a measurable outcome.

    Trace each field to its owner and lawful use. A useful pilot proves that the same outcome definition can be reported consistently across teams without granting unrestricted access to beneficiary or donor records. Keep a dependency register so that changing a foundation relationship does not silently break a dependent template app.

    Evaluate safely before changing a production environment

    Use the scenario above as a test case, not as an instruction to install every similarly named tile. Record the exact solution name, publisher, version, dependencies and target environment before making changes. Common Data Model for Nonprofits can have related packages or sample data; those entries do not necessarily represent separate business applications. A visible tile is not proof of a current licence, supported deployment path or successful configuration.

    For a supported, installable Dataverse application, verify Microsoft’s environment requirements first. Dynamics 365 apps require the appropriate licence and a database environment created with Dynamics 365 apps enabled where specified. Check your administrator role, regional availability and capacity. Export customizations, confirm a usable backup and work in a sandbox with synthetic data. Do not import sample data into a live tenant simply to reproduce an illustration.

    Define an operational acceptance test

    Have a representative nonprofit user walk through the stated example with a least-privileged account. Verify which tables and forms changed, what stayed in the existing application and which integration still needs to be implemented. Agree who owns record matching, exception handling, access reviews and ongoing support. This is particularly important when extending an existing environment with managed solution dependencies.

    Record expected outcomes before the pilot: one complete business transaction, correct access for each role, an intentional failure case and a recovery procedure. Document the exact product versions used in the pilot, and revisit the linked sources before approving rollout. This editorial guide is not a licence grant, regulatory certification or a guarantee that a package remains available in every tenant.

    Limitations and considerations

    Schema alignment alone does not remove data silos: matching, data quality, security and source ownership remain necessary. Microsoft will not guarantee future maintenance, updates or compatibility of its managed version from February 1, 2027. Continued operation is not the same as continued support.

    Alternatives to evaluate

    Compare a community-stewarded model, a maintained nonprofit ISV and a smaller organization-specific model. Preserve interoperable concepts where useful, but avoid adopting every entity if the organization cannot govern or populate it.

    Sources and verification

    This guide is an editorial interpretation of the primary documentation below, reviewed November 23, 2026. Product scope and lifecycle may change; rely on Microsoft’s current source for final decisions.